Security Consultancy – Route 2020: Dubai Metro Redline Extension – ExpoLink Consortium

admin
Apr 05, 2021 06:39:28 AM

Client: ExpoLink Consortium  
Place of performance: Dubai, UAE 
Date and duration: 2017 – 2020 
Value of contract: Confidential

BACKGROUND

The Route 2020 Dubai Metro Extension consists of a 15km-long rail line branching off the existing Dubai Metro Red Line, of which 11.8km is above ground and 3.2km underground, including an interchange on the Red Line at Nakheel Harbour and Tower Station. The extension of the metro will have seven stations including the Nakheel Harbour interchange and the flagship metro station at the Expo 2020 exhibition site. It is a project of great technical complexity, including 3.2km of tunnel drilled by a tunnel boring machine, a 1.2km open section and nearly 11.8km of elevated track.

PROJECT

Restrata was commissioned by the Expolink Consortium to provide consultancy services during the design, planning and construction phases of the metro extension project. As a sub-consultant to the consortium, Restrata has maintained an on-site presence to ensure we are able to provide the right advice, right on time. Working closely with the Expolink Consortium has allowed multiple disciplines within the team to seek security input on a variety of topics ranging from landscape design, to vehicle circulation, and blast mitigation.

Restrata has worked alongside the security sub-contractor to ensure the delivered solution meets the needs of the client and the requirements of the specification. Through every stage of this project, security best-practice, and risk minimisation has been integrated into every element of design and delivery of this world class project.

SOLUTIONS/SERVICES

  • Design Review
    • Security Threat & Risk Assessments of stations and track
    • Basis of Design and Minimum Performance Requirements
    • Security Design Strategy
    • Void Assessment and Mitigation
    • Implementation of Crime Prevention Through Environmental Design (CPTED) and Security in Design of Stations (SIDOS) measures
  • Concept Design Development
  • Sub-System Design Development
  • Detailed Design Development
  • Pre-Installation Review and Guidance
  • Construction and Installation Supervision
  • Testing and Commissioning

Defensive Driving Training – Iraq – Shell

Due to the varying conditions around the Majnoon and Basrah region, Shell as a pro-active and caring employer, wanted to ensure that their employees and contractors stay safe.
Read more

Defensive Driving Training – Lukoil, Iraq

Due to the varying road conditions in West Qurna 2, Iraq, aggressive driving styles by local employees which had led to a number of incidents,...
Read more

Defensive Driver Training – Kurdistan Region of Iraq

In 2004 DNO entered the Kurdistan region of Iraq and was one of the first International oil companies in the region, it has been in a leading position in its composite reserves and practical production...
Read more

Fill the form to download our brochure




      Request a Demo